The
original plan was to make the middle room either a stairwell to the 2nd level
or a bathroom, but in a moment of sanity... and since it already had a closet,
I have decided to keep it a bedroom and add a stairwell to the attic space from the back stairwell entry.
Bedroom
2 is also missing its 5-panel wood door. The previous owner decided to
take his rage out on the door, so I am in search of a door. I know I can
always get a new one on special order, but people are always tossing out these
doors, so I am going to hold out for a good find.
This
room has some minor patches that need to be made to the ceiling. We are
going to use the plaster washers, joint compound and screen method to stabilize
the lathe and plaster ceiling. The same crowns are going up in this room
as are in the other rooms. We lucked out on Maxsold.com at a recent
estate auction and have already found some of the furnishings for this
room.
The
color palette for bedroom 2:
Walls: soft rose
Ceiling: white
Trims: white
Budget
|
Actual
|
|
Building
material - we had some left-over supplies
(Crown
molding, nails)
(Ceiling
repair – plaster washers, screen, compound)
(Floors
– sandpaper)
|
$100
$80
$25
|
$35
$18
$17
|
Paint
(ceiling, trim and wall paint, floor stain)
Walls:
soft rose
Ceiling:
white
Trims:
white
Stain
color: tbd
|
$125
$50
|
$47
$38
|
Furnishings:
Bed
frame – found on Maxsold at an estate sale
New
mattresses – Groupon super sale on mattresses!
Area
rug
Dressers
Nightstands stands – found on Maxsold at an estate sale
|
$700
$1500
$300
$500
$300
|
$1
$300
$0
$0
$40
|
Totals:
|
$3680
|
$496
|
This
room will need new windows in the spring.
|
$2000
|
|
$5680
|
Pictures
to follow:
Before
|
|
During
|
|
After
|
Comments
Post a Comment